The Dewey Town board met at 9:05 April 19th for the annual spring road inspection. The following deductions and plans were discussed: 2023: Threshold Lane- large pothole needs repair Williams Rd. -pulverize and gravel per accepted bid Spaulding Rd.- apply 2 loads of gravel East of intersection with King Rd. Poquette Lake Rd.- blade patch intersection with Lakeview Church Rd., crack seal starting at Co. Rd. B going north approx. ¼ mile to end of new pavement, install new culvert just north of bridge over Bashaw Creek through the field driveway with owner’s permission Lakeview Church Rd.- crack seal ¼ mile going East from Co. Rd. H Swiss Chalet Rd.- crack seal approx. ¼ mile, starting 100' West of Spears driveway, going East to end of new pavement Spring Lake Rd.- crack seal ¼ mile, starting at Sand Rd. and going North Hilltop Rd.- apply 4" gravel starting at Dewey Town line, going West down the hill to Crosby heifer shed Sand Rd.- dig out 2 clay pockets and fill with sand, replace culvert just West of Erickson/Crosby driveway, remove small hump in ditch on South side of Western clay pocket, blade patch over new culvert East of H, cut several overhanging limbs East of H, pave and shoulder per accepted bid, boom saw South side (budget dependent) Town Hall Rd.- boom saw South of Carl Meister farm (budget dependent) Dewey Town Hall- install new roof vents Dewey Town Shop- do ridge cap repairs to prevent further leaks Town Chair will apply for LRIP grant for Swiss Chalet Rd. 2024 Town Hall Rd.- replace bridge crossing Bashaw Creek Williams Rd.- cut back trees on west side Lyle Atkinson Lane- apply 2" gravel Bashaw Lake Rd.- apply 2" gravel Gravel Knoll Rd.- apply 4" gravel starting at Jack Soelle driveway going north to Sand Rd. Sand Rd.- crack seal ¼ mile starting at H and going East to end of new pavement Spring Lake Rd.- blade patch new culvert at intersection of Sand Rd. Spring Lake Rd. and Lakeview Church Rd.- continue crack sealing 2025 and beyond Town Hall Rd.- apply 4" gravel starting at Dewey hall going North to highway 70 Bashaw Lake Rd.- boom saw Spring Lake Rd. and Lakeview Church Rd.- continue crack sealing Road inspection adjourned at 12:30 p.m. Comments are closed.
|
Categories
All
Archives
September 2024
|